Professional installation and environmental preparation work
This guide is based on the official Installation Instructions and ensures that every BC TAP operates in an optimized environment, reducing after-sales service rates and extending service life.
Installation environment limits
Before drilling and installation, please be sure to use instruments to test the site environment. If the following limits are exceeded, a pressure reducing valve or voltage regulator must be installed, otherwise it may cause water leakage or circuit burnout of the main unit.
2 - 4 kg/cm²
Inlet water pressure range
5°C - 40°C
Ambient temperature requirements
± 10%
Voltage stability deviation

Standard installation procedure
Step 01
Tabletop positioning and drilling
Ensure there are no beams obstructing the sink, then use a Ø 35mm drill bit to create a hole. Clean any rough edges around the hole to avoid scratching the faucet washer.
Step 02
faucet fixing and wiring
Pass the touch control cable and water supply pipe through the hole. Secure it with the special fixing bracket at the bottom to ensure that the faucet does not wobble when rotating.
Step 03
The main unit is connected to the filtration system.
Connect the tubing according to the "Inlet" and "Outlet" labels. Note that the NSF tubing must be inserted to a depth of 1.5cm and the safety clip must be fastened.
Step 04
Water supply and air venting in the circuit
Turn on the water supply to fill the heating tank with water until the water flows smoothly from the tap before starting the heating.
Step 05
System testing and leakage pressure testing
Let it stand for 15 minutes and observe the pipe joints. Check if the LCD panel temperature rises normally, and confirm that the light sensor and energy-saving mode are triggered normally.